Technical data sheet
Safety data sheet
Historic plaster surface imitation possible, with a range of application techniques
Hydrophilic and therefore with very good capillary active and water vapour diffusion properties
For both indoor and outdoor use
ECO certified
The mineral-based final rendering is particularly suitable for reconstructing historically significant plasterwork and can be used both indoors and outdoors.
Fixit 203 can be used in a range of applications and therefore covers a wide range of usage.
The old mill, which was converted to a multiple family dwelling, was one of the first historically important buildings to undergo energy-efficient renovation using Fixit 222, a worldwide first. Subsequently Fixit 203 Finish Coat with hydraulic lime was applied to the façade of the protected building to faithfully reproduce the original plasterwork.
Renovation of the building with a 30 – 60 mm thick layer of Fixit 222 Aerogel High Performance Insulating Plaster. Fixit 203 mineral-based finish coat followed by water-vapour permeable, hydrophobic, mineral-based Fixit 784 Silicate plaster roll-on paint.
The façade of this building in Zuoz, which is classified as worthy of preservation, was energetically renovated with 7 - 8 cm Fixit 222 Airgel high-performance insulating plaster. Fixit 203 was applied as the finishing plaster and painted with Fixit 784. The outer wall against the stable was insulated with Fixitherm.roc Compact Pro 034 140 mm.
A building group consisting of 23 elements - each with an individual fresco: a unique open-air museum.
The venerable vintner's house was restored in a gentle fashion. The façade and roof structure were renovated in accordance with current techniques.
The late Gothic building presumably served as a chaplaincy for the foundation of the Bullingerpfründe in 1460 and became a helper's house after its re-catholicisation in 1531. The approximately 500-year-old property, which is now a historic monument, has been renovated time and again over the course of its use, most recently 60 years ago completely and in 1990 with a gentle interior and exterior renovation.
This object was insulated on the inside with 100 mm Fixit 222 high-performance thermal insulation plaster. In the basement, the exterior walls were renovated on the inside with Fixit 210 Hydroment. The facade was fully embedded with Fixit 462 and plastered with Fixit203 plaster with hydraulic lime.
Conversion of a correctional facility into hotel/restaurant premises. The main planning effort was focused on the protected façade of the building, from which modern constructional elements (bay windows) extended. Using our Aerogel High Performance Thermally Insulating Plaster, the 350 m² west façade was insulated in accordance with the requirements of the preservation authorities.
Contact us! We will get back to you with advice.
Coordinated logistics
Excellent quality
Individual consulting