Information
All of the old plaster was stripped down to the brick and rebuilt with the airgel insulation system. The facade renovation was carried out with 4 cm Fixit 222 Airgel high-performance insulation plaster system and the mineral finishing plaster Fixit 777 2.0mm pos., was painted twice with the colored mineral paint Fixit 785 evo to the color Fixit 59018.