Information
The Chesa Palmira was built in 1672, and the original floor plan has remained unchanged till today. The façade of this historic building was energy efficiently renovated by applying an 8 cm thick layer of Fixit 222 Aerogel High Performance Insulating Plaster. Fixit 208 was used for the final coat. Finally lime whitewash was applied to the façade and the identical sgraffito pattern from 1952 was carved into it.